River Queen

It’s Coming!!!

A quick update about the new boat.

We’ve spent 2 full Saturdays up north working on the electrical system of the boat. I hired a marine electrical company to do the work. (I play the part of gopher – as in ‘go fer this and go fer that’.) We also decided that if we had to have a professional working on the boat, that we might as well do everything that we might ever want done. So we have run all new wires to all outlets, removed the old breaker system and installed a new marine breaker panel and added several new outlets in places that we felt they were needed. When everything is done we will have essentially rewired the complete AC system – which is a good thing. No surprises for us in the middle of winter when the boat is drawing full amperage.

There is less work to do on the DC system but that will be completed as well.

We’ve received a new deck box for the propane tanks and will be doing that this coming weekend too.

HOWEVER….

after spending hours on the road to get to the boat and then hours on the road getting home again each weekend, we’ve decided to eliminate the hours on the road and bring the boat down to Oakville. A marina there, simply asked, what size – how long and do you have insurance – and then gave us the OK to bring it down. So tomorrow the boat will be within 15 min driving distance of us here and will be easily worked on in the evenings and weekend. I hope to launch next week.

So that is exciting news for us – once down here – it’s just a hop, skip and jump away from being able to use it as our new home!

I’ll post some pics from when it comes in tomorrow.

Leave a Reply

Your email address will not be published. Required fields are marked *

+ 35 = 39